The new version of ICS is made up of several steps:
Step 1: the « pre-loading » message must be filed as early as possible and at least before the loading of the aircraft.
Step 2: the complete ENS declaration must be filed before the arrival of the aircraft.
Step 3: the arrival notification must be filed.